CONSTRUCTION PROJECT
Bridge Reconstruction Interstate Highway - Infrastructure Modernization

Overview
The Interstate Highway Bridge reconstruction project represents a critical infrastructure upgrade enhancing regional connectivity and safety standards. This comprehensive reconstruction involved complete demolition of the aging structure and construction of a modern, wider bridge designed to accommodate increased traffic volumes for the next 50 years. The project significantly improves traffic flow efficiency while incorporating advanced safety features and seismic resistance. Our engineering team successfully managed this complex project while maintaining traffic flow throughout construction.
Scope
Full reconstruction services including demolition of existing 800-meter bridge structure, construction of new dual-span bridge with expanded capacity, installation of modern safety barriers, LED lighting systems, advanced drainage, and comprehensive approach road improvements. Project deliverables included 4-lane bridge expansion, pedestrian walkways, emergency lanes, electronic traffic monitoring systems, and complete landscaping of surrounding areas.
Specification
Construction utilized high-strength prestressed concrete beams, corrosion-resistant reinforcement, expansion joints rated for heavy traffic loads, integrated cable management systems, and LED lighting throughout. The bridge design incorporates seismic isolation bearings, advanced drainage systems, anti-icing infrastructure, and meets all international safety standards with 75-year design lifespan.
Stakeholders
Key stakeholders included Indonesian Ministry of Public Works (client), Regional Transportation Authority, Local Municipal Governments, Environmental Impact Assessment teams, community representatives, logistics companies, and our specialized infrastructure consortium of 12 engineering firms. Weekly coordination meetings ensured minimal traffic disruption and adherence to strict safety protocols.
Timeline & Milestones
Design & Environmental Approval
8 months
Demolition & Site Preparation
6 months
Foundation & Structural Work
14 months
Finishing & Safety Systems
6 months
Testing & Traffic Integration
2 months
Total Duration: 36 months | Completed: August 2024