CONSTRUCTION PROJECT
Renewable Energy Power Plant - Solar Energy Infrastructure

Overview
The Renewable Energy Power Plant project represents Indonesia's commitment to sustainable energy independence through cutting-edge solar technology. This large-scale solar installation spans 200 hectares and incorporates advanced photovoltaic systems capable of generating clean energy for over 50,000 households. The project combines innovative solar tracking technology with comprehensive grid integration systems, energy storage capabilities, and environmental conservation measures. Our specialized energy construction team delivered this transformative infrastructure project while maintaining the highest environmental standards.
Scope
Complete solar power plant development including 150MW photovoltaic array installation, advanced solar tracking systems, electrical infrastructure with high-voltage transmission lines, control and monitoring facilities, energy storage systems, grid interconnection equipment, operations and maintenance buildings, security systems, access roads, and comprehensive environmental management including habitat preservation and water conservation measures.
Specification
Installation features high-efficiency monocrystalline solar panels with 22% efficiency rating, dual-axis tracking systems maximizing energy capture, weather-resistant mounting structures, SCADA control systems for remote monitoring, lithium-ion battery storage capacity, medium voltage electrical infrastructure, grid-tie inverters with advanced power management, and comprehensive environmental monitoring systems tracking local ecosystem impact.
Stakeholders
Key stakeholders included Indonesia Renewable Energy Corporation (client), Ministry of Energy and Mineral Resources, State Electricity Company (PLN), Environmental Impact Assessment teams, local farming communities, regional development authorities, and our specialized renewable energy consortium of 15 technology and construction partners. Quarterly community meetings ensured transparent communication about project benefits and environmental protection measures.
Timeline & Milestones
Environmental Assessment & Planning
6 months
Site Preparation & Infrastructure
4 months
Solar Panel Installation
12 months
Electrical Systems & Grid Connection
4 months
Testing & Commissioning
2 months
Total Duration: 28 months | Completed: May 2024
VISUAL DOCUMENTATION




"This solar power plant represents a milestone in Indonesia's renewable energy journey. The construction team's expertise in both traditional construction and cutting-edge solar technology delivered a facility that will provide clean energy for generations while protecting our environment."
Dr. Rida Mulyana
Director of Renewable Energy, Ministry of Energy and Mineral Resources